Education Sector

Please find below a number of case studies from our Education Sector. If you would like to contact us about any of the case studies below, we would be happy to discuss them further.

 

Case Studies

knavesmire_primary Client -  York City Council – Knavesmire Primary School

Main Contractor - William Birch Ltd

Mechanical Contractor - A D Environmental Ltd

Contract Duration - On Site works 38 Weeks

 

Description of Work

Supply and installation of a new Hitachi Air Source heat pump and Gas Fired heating system to serve a new radiator and under floor heating system providing heating to a new Gymnasium/Hall and classroom extension. The ventilation strategy was provided by natural roof turrets and low level motorised dampers. In addition to the extenion works the school required it’s enitre existing heating and domestic hot water distribution system to be modified due to asbestos issues.

Contract Value - £250,000.00


york_st_Johns Client -  St Johns University – Fountains Learing Centre

Main Contractor - Simpson (York) Ltd

Mechanical Contractor - A D Environmental Ltd

Contract Duration - On Site works 12 Weeks

 

Description of Work

To modify existing Mitsubishi R2 Heat Recovery systems with the addition of new internal units to suit the refurbished layout. The works included for total rewiring of the communication cabling and BMS installations including recommissioning with new refrigerant. A new comprehesive ductwork confirguration was installed serving the new ducted air conditioning units, along with modifications to the existing fresh air and extract systems. New domestic services were installed to serve the new kitchenette and various water points.

Contract Value - £68,000.00


university_of_leeds Client -  University of Leeds

Main Contractor - Garside and Laycock

Mechanical Contractor - Woods North East Ltd

Contract Duration - On Site works 10 Weeks

 

Description of Work

Installation of Gas supply pipework to replacement boilers within student accommodation c/w flue modifications. Installation of DHW and CWS to suit new kitchen layouts within a tight time scale. A D Plumbing and Heating worked alongside all trades to ensure the project was completed on time to allow students returning to study.

Contract Value - £27,540.00


lowfield_primary Client - Sheffield City Council

Main Contractor - William Birch (York)

Mechanical Contractor - A D Environmental Ltd

Contract Duration - 20 Weeks

 

Description of Work

Supply and installation of Mechanical services for the Myspace project, and School extension. The work consisted of the installation of Broag Rehema High Effciency boilers, serving underfloor heating configurations, and unvented hot water cylinders. Mitsubishi Heat Recovery units were used to supply fresh air to the spaces, and the project was conrtolled using a Trend Buding Management system

Contract Value - £182,000.00


hull_university Client - University of Hull – Scarborough Campus

Main Contractor - William Birch (York)

Mechanical Contractor - A D Environmental Ltd

Contract Duration - 13 Weeks

 

Description of Work

Installation of New AHU plant and Air Conditioning to suit the refurbishment of Student Lecture Theatres, Meeting Rooms ad Library. The installation included Heat Recovery units, along with Passive Ventilation and a Refrigerant Heat Recovery system.

Contract Value - £123,000.00